Gerba South Wollo Amhara Region Ethiopia

Project Name: Supply and installation of Solar system

Project Objective: To install Solar System to off grid rural community

Tasks:

  • Mounting Solar PV Panels
  • Mounting Charge Controllers
  • Connecting the cables
  • Connecting batteries
  • Load Test and Documentation

Project Duration: 4 Weeks

Kemisse South Wollo Amhara Region Ethiopia

Project Name: Design Construction and Installation of an automatic Solar powered water pumping, delivering and distribution system

Project Objective: To install a water system to supply water to  a community home use and irrigation

Tasks:

  • Site visit and water pump selection
  • Carryout a pump and recovery testing(24hrs constant) including water quality test
  • install a steel tank tower to support two tanks of 5000 litters each 6 meter high
  • Construction pump protection unit and tap stand
  • Design and Install Solar powered water pumping system

Project Duration: 12 Weeks

Prosperity Party building Addis Ababa Ethiopia

Project Name: Design, Supply and Installation of Hybrid power backup system

Project Objective: To install hybrid 15KVA power backup system for G+10 building

Tasks:

  • Wiring power cables for each floor
  • mounting distribution board( MDB & SDB)
  • Connecting batteries
  • mounting Solar PV Panels to charger controller
  • Load Testing and Documentation

Project Duration: 2 Weeks

Abyissina Steel Debrezit Oromia Ethiopia

Project Name: Design, Supply and Installation of Hybrid power backup system

Project Objective: To install hybrid different size power backup system for factory site

Tasks:

  • Site survey and path selection for cabling
  • Wiring power cables for the selected path
  • mounting distribution board( MDB & SDB)
  • Connecting batteries
  • mounting Solar PV Panels on factory site
  • connecting Solar PV panels to charger controller
  • Load Testing and Documentation

Project Duration: 12 Weeks